US Army Medical Department - Multiple Restroom Renovation


GARRISON | NAMVAR | Government was proud to serve Linc Government Services and the US Army by remodeling almost 50 restrooms and locker rooms in a US Army Medical Department Center and School (AMEDDC&S) facility beginning January of 2010 and finishing the same year. GARRISON | NAMVAR was able to develop a plan that completed all the bathrooms in half the originally estimated time. 


United Excel - Optical Fabrication Laboratory


GARRISON | NAMVAR | Government was proud to serve United Excel and the Corps of Engineers in the renovation and expansion of their 5,000 sf government manufacturing building into a modernized 10,000 sf optical eye wear production facility.  GARRISON | NAMVAR was able to develop a plan to avoid disruption to ongoing operations.  GARRISON | NAMVAR provided a Two Phase construction approach utilizing self-contained trailers for latrines, break room, lunch room and storage.


Brooks City Base - Metro Health Renovation


GARRISON | Government was proud to serve San Antonio Metropolitan Health District's Public Health Emergency Preparedness (PHEP) Division in the renovation of their office space in building 125.  GARRISON was able to Collaboarte with Brooks City Base to bring the existing building on the former Air Force Base up to date with new doors and floor, wall, including refinishes wood paneled corridor walls, and ceiling finishes throughout the 10,000 square foot space.


Contact Us

Garrison | Namvar

9110 IH-10 West, Suite #111

San Antonio, TX 78230

(210) 858-8281

This email address is being protected from spambots. You need JavaScript enabled to view it.